Development of Environmental Compliance Documentation

Projects

/01

Development of an Environmental Protection Measures Plan (PMOOS) as part of a power plant construction project

/01

Development of environmental documentation for the plastic processing site

/01

Development of PNOOLR, PDV and PDS projects for Sakhalin II project facilities

View
other projects

The successful implementation of specific project phases requires the timely preparation of environmental documentation and/or the acquisition of relevant regulatory permits in accordance with applicable legal and regulatory frameworks. These may include licenses, approvals, permits, authorizations, conclusions, and other formal decisions (hereinafter referred to as “Permits”).

The development of environmental documentation and the receipt of Permits are critical to meeting key project milestones and ensuring timely progress through all implementation stages – from the design and permitting phase to commissioning and operation of the project facilities.

Our company provides comprehensive support for the preparation of key environmental documentation required to obtain environmental Permits, including but not limited to:

  • Emission Source Inventory Report (identifying sources of air pollutants);
  • Maximum Permissible Emissions (MPE) Project, which forms the basis for further permitting (e.g., sanitary-epidemiological conclusion, State Environmental Review (SER), air emission permit for stationary sources), or the development of a declaration for environmental impact;
  • Application package for obtaining a Permit for the use of water bodies, including for the discharge of wastewater or drainage;
  • Maximum Permissible Discharges (MPD) Project, which after approval is either affirmed by the competent authority or integrated into an environmental impact declaration, depending on the hazard class of substances and the category of the environmentally hazardous activity;
  • Waste Generation and Disposal Limits (WPDL) Project or justification of waste generation norms and disposal limits, which, depending on the project’s classification, are included in the environmental impact declaration or the State Environmental Review;
  • Sanitary Protection Zone (SPZ) Design;
  • Land Reclamation and Rehabilitation Plan for disturbed or contaminated land plots;
  • Environmental Monitoring Programs covering various project phases;
  • Industrial Environmental Control (IEC) Program and accompanying compliance reporting.

Preliminary estimates of maximum permissible emissions and discharges, waste generation justifications, and proposed IEC measures are typically integrated into the project design documentation as part of the “Environmental Protection Measures” section (linked with the section on Environmental and Social Impact Assessment and Management Planning).

When required, our company also provides regulatory support services, guiding the documentation through all necessary approval processes and expert reviews.

Гибкое содержимое не найдено

Projects

/01

Development of an Environmental Protection Measures Plan (PMOOS) as part of a power plant construction project

Branan Environment developed the section “Environmental Protection Measures Plan” (PMOOS) as part of the power plant construction project based on two gas engine generator sets for the Pokrovsk Integrated Gas Treatment Unit of OJSC “Orenburgneft”.

/01

Development of environmental documentation for the plastic processing site

Branan Environment has carried out an environmental impact assessment of the production of secondary pellets of high-pressure polyethylene, low-pressure polyethylene and polypropylene at a facility in the Leningrad region, Gatchina, and developed a set of environmental documentation

/01

Development of PNOOLR, PDV and PDS projects for Sakhalin II project facilities

Under a contract for comprehensive environmental consulting services with a major international oil and gas producing company, Sakhalin Energy, operating in the territory of the Russian Federation (Sakhalin Oblast), within the framework of the Sakhalin II Project, Phase 2, Branan Environment specialists performed