service

Pre-Insurance Environmental Surveys

Projects

/01

Environmental pre-insurance survey of a major mining and metallurgical company

Watch
other projects

Pre-insurance environmental surveys are a specific type of site audit conducted to evaluate the environmental risks and potential liabilities of a facility prior to obtaining insurance coverage. These assessments go beyond verifying compliance with environmental, occupational health, fire, and industrial safety legislation and consider a range of site-specific risk factors depending on the scope of the planned insurance policy.

Typical elements assessed include:

  • History of environmental, health and safety-related incidents, claims, and legal actions involving the enterprise;
  • Risks associated with legacy (historical) contamination from past industrial activity;
  • Risks related to ongoing operations at the site;
  • Potential for accidental events with environmental and/or social impacts, including their likelihood and severity;
  • Estimated damage from such events, including costs of site remediation and restoration;
  • Potential losses due to business interruption;
  • Liability for third-party damage;
  • Maximum foreseeable loss estimate (Probable Maximum Loss, PML);
  • Worst-case scenario loss estimate (Maximum Possible Loss, MPL).
Гибкое содержимое не найдено

Projects

/01

Environmental and Social Due Diligence Assessment of the Almaty International Airport Reconstruction project

Нашей Компанией в сотрудничестве с компанией Waterman была проведена оценка по типу «дью дилиженс» (Environmental and Social Due Diligence Assessment) по международным стандартам (МФК и ЕБРР).

/01

Audits of MMC Metalloinvest enterprises

Нами были проведены выездные аудиты ключевых предприятий компании – Оскольского электрометаллургического комбината, Лебединского и Михайловского ГОКов, Уралстали (в то время входившей в состав Металлоинвеста).

/01

Audit of Environmental Protection, Occupational Health and Safety, Industrial Safety, and Social Aspects at a 3M Company Facility

Компания 3М – международная производственная корпорация, объединяющая более тридцати бизнес-направлений в области электроники, энергетики, здравоохранения, безопасности, промышленности и др. В Волоколамске располагается крупнейший завод по производству средств индивидуальной защиты органов дыхания и инновационных полировальных паст в России и странах СНГ.

/01

Monitoring of the Arctic LNG 2 Project Implementation

Объем работ независимого консультанта по экологическим и социальным вопросам (IESC) заключается в проведении мониторинга с целью проверки соответствия показателей проекта национальным и международным обязательствам и требованиям охраны труда, окружающей среды и безопасности (ОТОСБ), применимым к проекту.

/01

Monitoring of сonstruction and operation of the TOAZ urea production unit

В сотрудничестве с компанией RINA специалистами нашей Компании проводился регулярный мониторинг процесса строительства и эксплуатации установки производства карбамида на комбинате АО «Тольяттиазот».

/01

Monitoring of the сonstruction and operation of a mining and processing plant in the Republic of Kazakhstan

Консультантами Компании в течение четырех лет проводился регулярный мониторинг процесса строительства и эксплуатации свинцово-цинкового рудника и обогатительной фабрики на территории Республики Казахстан для ЕБРР.

/01

Environmental pre-insurance survey of a major mining and metallurgical company

Branan Environment consultants conducted an environmental survey of an enterprise owned by a major mining and metallurgical company in order to assess environmental risks and liabilities for insurance purposes.

/01

Background environmental studies on the area of Pulkovo Airport

Within the framework of the development project of Pulkovo Airport (Saint Petersburg) on the basis of public-private partnership, Branan Environment consultants conducted background environmental studies of the airport area.

/01

Background engineering and environmental surveys of the license area in the Yamalo-Nenets Autonomous District

Branan Environment specialists conducted a series of environmental engineering surveys to study the background state of 1A license area of the Urengoy oil and gas field.

/01

Background environmental and socio-economic studies of two operated coal deposits in the Republic of Sakha (Yakutia)

Our consultants completed background environmental and socio-economic studies of two operated coal deposits in the Republic of Sakha (Yakutia) on behalf of Kolmar Company.

/01

Baseline environmental survey in Ryazan

Branan Environment conducted environmental baseline studies at oil refinery facility in Ryazan.

/01

Contamination assessment of the automobile plant in Moscow

Branan Environment carried out an environmental site assessment of several areas within Moskvitch, later Avtoframos/Renault plant in Moscow for the large automobile company before their transfer to the new owner in accordance with ASTM E1903-19.

/01

Study of soil and groundwater contamination on the territory of automobile plants

For Renault-Nissan Corporation, under a contract with Antea, work was carried out to study soil and groundwater contamination at the main production sites and infrastructure facilities in Tolyatti and Izhevsk.

/01

Study of soil and groundwater contamination at production sites of confectionery factories

Research on soil and groundwater contamination at the production sites of confectionery factories in St. Petersburg and the Leningrad region, Ulyanovsk, Yekaterinburg and at 12 sites of confectionery factories in Ukraine (Mukachevo, Dnepropetrovsk, Donetsk and Lugansk) has been carried out on behalf of Orkla Foods company.

/01

Environmental impact assessment of offshore projects

Branan Environment specialists have significant experience in environmental impact assessment in the marginal and inland seas of the Russian Federation, especially in the conditions of the sensitive and fragile nature of the Arctic.

/01

Development of a package of documents for ESIA of construction and operation of the VGO hydrocracking complex as part of JSC “RNPK” – NK “Rosneft”

Consultants of our Company developed a package of documents for the environmental and social impact assessment of the project for construction and operation of the vacuum gas oil (VGO) hydrocracking complex as part of JSC “RNPK” – NK “Rosneft” (Ryazan city).

/01

Development of environmental and social management plans for a large petrochemical complex construction project

The project for construction of the West Siberian complex for deep processing of hydrocarbon feedstock into polyolefins with a capacity of 2.0 million tonnes per year (a subsidiary of the leading Russian petrochemical holding “SIBUR”) was implemented in the industrial zone of the city of Tobolsk.

/01

Assessment of asbestos-containing materials

For the international company for the production of soft drinks, dairy products and snacks, under a contract with Arcadis, an assessment was carried out with sampling of materials that may contain asbestos (insulation and roofing materials, decorative and floor coverings, wall and ceiling panels, etc.) at the sites of more than 20 factories in European Russia, the Urals, in Siberia, the Far East, as well as in Georgia and Kyrgyzstan.

/01

Environmental assessment of materials at the enterprises of the OAT Group

The OAT Group is the largest association of manufacturing enterprises. The OAT Group includes 9 manufacturing enterprises in 5 regions of Russia. The machine-building enterprises of the OAT Group have a full technological cycle of component production. The main customers of the OAT Group products are PJSC AVTOVAZ, PJSC KAMAZ, GAZ Group, PJSC UAZ. More than 90% of all products of the OAT Group are supplied to LADA cars.

/01

Environmental assessment of equipment, materials and infrastructure facilities

An environmental assessment of equipment, construction materials and infrastructure was carried out on behalf of Ford Motor Company under a contract with Arcadis in accordance with the client’s procedural requirements to rank environmental risks during the closure of production facilities, including possible dismantling and removal of equipment and structures

Watch
other projects